午夜黄色-蜜色av-国产精品99999-久久视频一区-九色porn-亚洲αv-第一av-亚洲精品视频免费看-不卡一二三-久久久久久久福利-国产精品国产三级国产专区53-一个色的综合-国产免费一区二区三区最新6-欧美激情国产精品日韩-成人午夜精品福利免费-金瓶风月在线-成人ay-久久精品专区-爽好大快深点视频网站-亚洲の无码国产の无码步美-欧美黑人疯狂性受xxxxx野外-а√天堂8资源中文在线-人妻无码久久精品人妻-麻豆出品必属精品-中文字幕日本一区二区

Others

Far East KSG Iron Ore Project, Russia

Release time:2013-06-21 Article source: Reading times: A+ A A-

 

The KSG Iron Ore Mining Project is implemented over three stages with a total investment of approximately USD 2 Billion. On March 23th 2010, Mr. Xi Jinping as vice-presidentm Ms. Liu Yandong as State Counselor of China and Mr. Zhukov as Deputy Prime Minister of Russia witnessed the signing of the EPC Contract Cooperation Agreement of the project by CNEEC.

Stage 1:Development of Kimkan Iron Ore Mine for ore beneficiation plant with annual iron ore production of 10,000,000 tons and iron ore concentrate with average grade of no less than 65% Fe.

Stage 2:Development of Garinskoye Iron Ore Mine and expansion of ore beneficiation plant and infrastructure of Kimkan Mine, which will extent to the production of iron ore concentrate with average grade of no less than 65% to 8,300,000 tons.

Stage 3:Development of Sutara Iron Ore Mine for a metallurgical DRI plant with annual sponge iron production of 2,500,000 tons.

 

Quick link

Contact us

ADD : CNEEC BLDG., 9, SOUTH SHOUTI RD., HAIDIAN DISTRICT, BEIJING 100048 P.R.CHINA

TEL : (8610)68798899

FAX : (8610)68798000

E-MAIL : cneec@cneec.com.cn

Legal Notice| Site Map

Beijing ICP No. 17028836    Copyright?China National Electric Engineering Co., Ltd. , All Rights Reserved